How to Compare UK 3PL Quotes Without Getting Caught Out
TL;DR
3PL quotes are rarely comparable as sent, because providers price on different units, bundle different work, and assume different volumes. Convert every quote into cost per order at your own volume, items per order, storage footprint, and returns rate. Check minimums, surcharges, and exit fees. The cheapest headline rate is often not the cheapest total.
Comparing 3PL Quotes in the UK
You have three 3PL quotes open, and none of them looks like the others. One charges storage per pallet per day, another per pallet per week, and the third per cubic metre per month. One quotes pick and pack as a single fee per order, another per item, and the third splits pick, pack, and packaging into separate lines. One has a monthly minimum, one has a platform fee, and one has neither but a higher rate on everything. Each provider has made its own price look reasonable, and none of them has made it easy to compare with a rival.
That is the normal state of 3PL pricing in the UK, not a sign that anyone is hiding something. Providers price on different units, bundle different work into the headline rate, and quote against their own assumptions about your volume. The only way to compare them is to convert every quote into one number: cost per order, at your volume and your order profile.
This guide is for brands with quotes in hand, whether you are outsourcing for the first time or moving from another provider. It sets out every line item a quote can contain, the charges that catch people out, and a worked method for normalising two quotes, with the arithmetic shown. For what fulfilment costs in general, see what UK fulfilment typically costs.
Gonini, a UK and EU fulfilment provider, issues the kind of quotes this guide teaches you to scrutinise, so we have an interest in how you compare them. The method works the same whichever provider you choose.
Quick Summary: The Line Items in a 3PL Quote
A full 3PL quote can contain eleven types of charges. The table below shows how each one is usually charged, what drives it up, and whether it is often left out of the headline rate.
Methodology
Every figure in this guide is either a published rate, labelled with its source and the date we checked it, or an illustrative figure, labelled as such. Illustrative figures show how the arithmetic works and are not any provider’s real prices. For how these costs fit together on a real bill, see direct to consumer fulfilment costs.
The worked example uses the assumptions below:
- Order volume: 1,000 orders a month, with a second scenario at 600
- Items per order: 1.5 on average, so 500 extra items a month at 1,000 orders
- SKU count: 300 active SKUs
- Storage footprint: 20 pallets held throughout the month, at about 4.33 weeks or 30 days a month
- Inbound: 10 pallets received each month
- Returns rate: 5% of orders, so 50 returns a month at 1,000 orders
- Parcel profile: small to medium parcels, all within the UK
Change any of these to match your own business before you compare real quotes. A quote that wins at one profile can lose at another, which is the point the example makes.
Why UK 3PL Pricing Is Hard to Compare
Two things stop 3PL quotes lining up: the units they price in, and what they include in each line.
Different Pricing Units for the Same Work
The same piece of work can be priced on several different units. Storage is the clearest case. Gonini publishes UK storage per week, at £1 to £2 per shelf and £2.50 to £5 per pallet (gonini.com/pricing, November 2026). Fulfillable publishes storage per day, at £0.80 per pallet, and ShipBob’s UK pricing page lists sample storage rates per month in US dollars, while stating that all quotes are customised (both checked on the provider’s own website, October 2026). A rate of £0.80 a day and a rate of £5 a week look similar until you convert them: £0.80 a day is about £5.60 a week.
Pick and pack varies in the same way. Some providers charge per order, with a separate fee for each extra item. Others charge per item from the first one, which makes single-item orders cheap and large baskets expensive. Receiving can be per pallet, per carton, or per hour, and the hourly version is impossible to compare until you know how long your deliveries take to unload.
Our guides to how Huboo structures its pricing and how ShipBob’s fees are built show two real, differently structured models side by side. The fix is to convert every rate to the same unit before you compare anything: storage to per pallet per month, and pick and pack to cost per order at your average basket.
Different Bundling, and What Sits Outside the Headline Rate
Units are only half the problem. Providers also bundle different work into each line. One provider’s pick-and-pack fee includes the box, void fill, and label, while another charges for each separately. One includes receiving up to a set number of pallets, and another charges for every carton. Gonini, for example, includes standard packaging in its pick-and-pack rate.
The headline rate is the number a provider chooses to lead with, and it is usually the line where it is most competitive. A low pick fee can sit alongside a high storage rate, a monthly minimum, or a shipping markup. None of that is wrong, but it means the headline tells you little on its own.
Ask every provider for a full rate card, not a summary. Then mark each line as included, charged separately, or not offered, so that you can see where the bundles differ.
The Line Items in Detail
Each line on a quote has its own unit and its own way of growing. The six below make up most of a fulfilment bill. The components of a fulfilment bill guide covers them in more depth, and our guide to eCommerce fulfilment cost structures shows how the pricing models differ.
Receiving and Goods-In
Receiving covers unloading your stock, counting it, checking it against the delivery note, and booking it into the warehouse system. Providers charge per pallet, per carton, or per hour, and some include it up to a set volume.
What you send decides what you pay. Labelled cartons, one SKU per carton, and an advance shipping notice cut handling time, while loose or mixed deliveries are slower and often charged by the hour. Ask what counts as a non-standard delivery and what it costs, because that is where receiving bills grow.
Speed matters as much as price. At Gonini, we book in inbound stock within 2 working days. Ask every provider for its booking-in time, because you can't sell stock that isn't booked in.
Storage, and How It Is Measured
Storage is billed by the space your stock takes up, per pallet, shelf, or bin, and per day, week, or month. Convert every rate to the same unit before comparing: per pallet per month is the easiest, using about 30 days or 4.33 weeks a month.
Then check how space is measured. Some providers bill a full pallet position even when a pallet is half empty, and some bill by cubic metre. Ask whether storage is billed on the space reserved or the space used, and how often it is counted.
Long-term storage is the line to watch. Some providers charge a higher rate for stock held beyond a set period, which hits slow-moving or seasonal lines. Ask whether that applies, from when, and at what rate.
Pick and Pack
Pick and pack covers taking items from the shelf, packing them, and labelling the parcel. Most providers charge a base fee per order for the first item, and a smaller fee for each extra item, so your average basket size decides what you actually pay. For how this works and is usually priced, see how pick and pack is charged.
Product size moves the rate. Gonini’s published UK rates for a one-item order run from £0.60 to £0.90 for small items, £1 to £2 for medium or fragile items, and £2 to £6 for large or bulky items (gonini.com/pricing, November 2026). Like most providers, Gonini adds an incremental fee for each extra item.
To compare fairly, work out your cost per order from the base fee plus the extra-item fee at your average basket. A provider with a higher base fee and a low extra-item fee can be cheaper for multi-item orders.
Packaging Materials
Packaging covers boxes, mailers, void fill, tape, and labels. Some providers include standard packaging in the pick fee, while others bill each material per order.
Neither model is better in itself. Bundled packaging makes costs predictable, while itemised packaging lets brands with unusual products pay only for what they use. Branded boxes, inserts, and custom packaging usually cost extra on both models, because they take longer to pack. For more on packaging choices, see packaging choices and costs.
Packaging also affects shipping. An oversized box can push a parcel into a higher carrier band, so ask how the provider chooses box sizes for each order.
Shipping and Carrier Markup
Shipping is usually the highest single cost per order, and it is the line where quotes differ most in how they are built. Some providers pass on their negotiated carrier rate with a margin added, some quote a fixed rate per parcel by service, and some bundle shipping into a per-order price.
Ask which model applies, and ask for rates by service, weight band, and zone, not a single average. Check what is excluded: fuel surcharges, remote area surcharges for parts of Scotland and the islands, and oversize fees can all sit outside the base rate. For a view of UK carrier rates, see UK courier rates compared.
Gonini quotes delivery per client. Whatever the provider, compare shipping on the same services, because next-day and two-day rates are not interchangeable.
Returns
Returns processing covers receiving the parcel, inspecting the item, and restocking, repackaging, or disposing of it. Most providers charge per return, with extra fees for refurbishment or grading.
Your return rate turns this from a minor line into a major one. A 5% return rate means a returns fee on one order in twenty, while a fashion brand can pay it on many more. Ask what the fee covers and how quickly returned stock goes back on sale, because a slow restock ties up sellable stock. At Gonini, returns are booked in within 2 working days, meaning each item is inspected, then restocked or quarantined. For more on the process, see returns handling and cost.
The Charges That Catch People Out
Three types of charges cause most of the surprise invoices. Brands tell Gonini that peak surcharges and monthly minimum fees are among the reasons they left a previous 3PL.
Minimum Monthly Spend
A minimum is a floor. If your fees for the month come to less than the minimum, you pay the minimum anyway. It can be set in orders, in spend, or both, and it can include or exclude shipping.
A minimum rarely bites in a normal month. It bites in January, after a launch slips, or when a product goes out of stock, which is exactly when cash is tight. Ask what the minimum is, what counts towards it, and whether it changes after an initial period.
Minimums are not always a bad sign. They let providers plan staffing and offer lower unit rates. Gonini’s minimum is 100 orders a month. Include the minimum in your comparison, as the worked example below does.
Surcharges: Peak, Fuel, Oversized, Hazardous
Surcharges are charges added on top of the normal rate in particular conditions. The four common ones are below:
- Peak surcharges: higher pick, pack, or shipping rates in the busiest weeks, usually from November to December
- Fuel surcharges: a percentage added to shipping that moves with fuel prices
- Oversize surcharges: extra charges for parcels above a carrier’s size or weight limits
- Hazardous goods surcharges: extra handling and carrier fees for goods such as batteries, aerosols, or flammable products
Surcharges are often in the terms and conditions rather than the quote itself. Ask each provider to list every surcharge that could apply to your products, with the rate and the period it applies to, and add them to your comparison for the months they cover.
Setup, Onboarding, and Exit Fees
Setup and onboarding fees are one-off charges to start: connecting your store, configuring your SKUs, and receiving your first stock. Some providers charge them, and some do not. Gonini charges no setup or integration fees.
Exit fees deserve more weight than any other line because they rarely appear in the headline quote, and they make a bad decision expensive to reverse. They can include a fee for ending the contract early, a charge for every pallet or unit moved out, and fees for a final stock count. A long notice period works like an exit fee, since you keep paying the old provider while you move.
Ask four questions before you sign: how long is the notice period, what does it cost to leave, how quickly will stock be released, and will your order and inventory data be handed over. Gonini runs month to month, with no exit fees. For how a move between providers works, see moving to a different provider.
Normalising Two Quotes: A Worked Example
This example takes two quotes with different structures and converts both into cost per order. Both quotes and all their rates are illustrative, not real provider prices, and the assumptions are set out in the methodology.
The table below shows the two quotes as a provider would send them.
On headline pick and pack, Quote A looks £0.50 an order cheaper. The table below converts both quotes at 1,000 orders a month.
At 1,000 orders, the £0.50 gap on the headline rate shrinks to 6p per order once you count storage, packaging, the minimum, and the fuel surcharge. Quote A is still slightly cheaper, but only just.
Now run the same quotes at 600 orders a month, with 300 extra items and 30 returns. Quote A’s fees before shipping come to £1,670, so the £2,500 minimum adds an £830 top-up, and shipping with the fuel surcharge adds £2,246.40, for a total of £4,746.40, or £7.91 per order. Quote B comes to £4,036.40, or £6.73 per order. In a quiet month, the quote that looked cheaper costs £1.18 more per order.
That is the case for normalising. Run every quote at your normal volume and at your quietest month, and compare the cost per order in both.
Questions to Ask Before You Compare 3PL Quotes
You can avoid most of the quote-comparing work by asking for comparable quotes in the first place. Send every provider the same brief, with your order volume, items per order, SKU count, storage footprint, product sizes, and returns rate, and then ask the questions below:
- What is included in the pick-and-pack fee, and what is charged separately?
- What unit is storage billed in, and is it billed on reserved space or used space?
- How is receiving charged, and what counts as a non-standard delivery?
- Is shipping passed through, marked up, or fixed, and which surcharges can apply?
- Is there a minimum, in orders or spend, and does it include shipping?
- What are the fixed monthly fees, such as platform or account fees?
- What are the contract length, notice period, and exit fees?
- How quickly is inbound stock booked in, and how quickly are returns restocked?
- Can you share a sample invoice for a client with a profile like ours?
A provider that answers every question in writing has given you a quote you can normalise. For more questions to put to a shortlist, see questions to put to a provider, and for a full selection process, see the full provider selection checklist. To build a shortlist to send your brief to, see UK 3PL providers compared.
Honest Limitations
Normalising 3PL quotes gives you a fair price comparison, but price is not the whole decision, and three limits apply.
The cheapest quote is often the wrong choice. A provider that prices low on pick and pack frequently recovers the margin on storage, shipping, or surcharges, which normalising will show. But a provider can also price low because it runs a leaner operation that costs you in errors, slow receiving, or missed cut-offs, and no quote shows that.
Cost per order changes with volume. As the worked example shows, a comparison at today’s volume can invert at a different one. If you expect to grow, or your sales are seasonal, run every quote at several volumes, including your quietest month and your peak.
Some real differences do not appear in any quote. Pick accuracy, dispatch reliability, how quickly a problem is fixed, and how well the account manager knows your business all affect your costs through refunds, reshipments, and lost customers. Ask for performance figures and hold providers to them in the contract: Gonini publishes 99.9% pick accuracy, with a barcode scan on every pick, and 99.5% of orders dispatched on time. For what to measure, see what a fulfilment SLA should contain and the KPIs to hold a provider to.
Use cost per order to narrow the list, then choose on service.
To compare a Gonini quote with the ones you already have, request a quote based on your own order profile.
FAQ
What does a typical 3PL quote come to per order?
It depends on product size, volume, and the services you need. In this guide's worked example, two illustrative quotes come to £6.24 and £6.30 per order at 1,000 orders a month, including shipping. Gonini’s published UK rates run from £0.60 to £6 per one-item order for pick and pack, and £2.50 to £5 per pallet per week for storage, plus a platform fee from £499 a month plus usage. Most providers quote per client. See Gonini’s pricing.
How is 3PL storage usually priced?
Per pallet, shelf, or bin, and per day, week, or month, depending on the provider. Convert every rate to per pallet per month before comparing. Gonini prices storage per week. See Gonini’s eCommerce warehousing.
What hidden fees should I look for in a 3PL quote?
Check for receiving charges, extra-item fees, packaging, minimum monthly spend, peak and fuel surcharges, long-term storage, and exit fees. Ask for a full rate card and a sample invoice. See switching 3PL providers.
Is there a standard 3PL quote template?
No. Each provider uses its own structure, which makes quotes hard to compare. Build your own template from the line items in this guide, and fill it in for every quote. See Gonini’s pick and pack.
Why do 3PL quotes vary so much?
Providers price on different units, bundle different work into each line, and quote against different assumptions about your volume. Convert each quote into cost per order at your own profile to see the real difference. Get a quote based on your order data.
Should I always choose the cheapest quote?
No. A low headline rate can hide higher charges elsewhere, and quality differences such as accuracy and dispatch reliability do not appear in any quote. Compare cost per order, then choose on service. See Gonini’s eCommerce 3PL.
As a part of the Gonini team, I help e-commerce brands strengthen their fulfilment operations across the UK, Germany, the Netherlands and the US. I work with merchants that want to simplify logistics, reduce costs and expand into new markets. I’m also building my own e-commerce brand, which gives me practical insight into the challenges founders face. In my writing, I share fulfilment strategies, growth lessons and real-world advice drawn from both sides of the industry.
